Covered Bridge Update

News reporter Mark Rivera stands next to Aaron Underwood (holding the bridge poster) after spending the morning in Long Grove on August 22nd.

News reporter Mark Rivera stands next to Aaron Underwood (holding the bridge poster) after spending the morning in Long Grove on August 22nd.

Last week, Mark Rivera of ABC Channel 7 came to Long Grove to interview members of the Historical Society, merchants, and residents about our covered bridge. To view the story that aired on the evening news on Friday, August 24th, click on the picture link below:

All summer long, it seems that everyone I interact with is curious about the covered bridge. At a gathering this morning in Long Grove with Brad Schneider, even the Congressman asked me for an update on the topic. Here are where the repairs stand currently, according to the Village of Long Grove’s 8-23-18 newsletter:

  • Having Robert Parker Coffin Road closed to traffic at the bridge for two months now has caused inconvenience to residents and hardship to the downtown businesses. Everyone agrees that it is a priority to get the road opened again.
  • The most historic parts of the bridge, the metal truss and walkway and the foundations, are in the same condition as prior to the accident.
  • The damaged wooden cover needs to be either demolished and rebuilt or repaired. The Village engineers have recommended demolition and reconstruction, and the insurance company has proposed repairs to what is currently left. The Village Board will be weighing these options at their next meeting this coming Tuesday, August 28th.
  • If the cover is removed, the Village Board is also considering making other long-term needed repairs such as repairing or replacing the limestone abutments.
  • Because the bridge is a historic structure, the Village has recently become aware of potential federal funding that could help with the costs of restoration up to 80%. However, details and availability of this funding option have not yet been confirmed.

Stay tuned to see how the decisions unfold in the months to come.

Lining up the camera shot and getting miked for my interview with ABC Channel 7's Mark Rivera inside the Covered Bridge Creamery.

Lining up the camera shot and getting miked for my interview with ABC Channel 7’s Mark Rivera inside the Covered Bridge Creamery.